Most full bathroom remodels in San Antonio take 2–4 weeks from demolition to completion. Projects with layout changes or custom materials may run 4–6 weeks. The timeline is set mostly by material lead times and permit approval, which is why fast cabinet production makes such a difference. A full remodel moves through demolition, plumbing and electrical rough-in, inspection, drywall, waterproofing and tile, paint, cabinets and countertop, fixtures, and custom glass if included, in that order.
The bathroom remodel timeline, week by week
Graphic: horizontal timeline from consultation to final walk-through, built from the table below
Here is how a 4-week full remodel runs:
| When | What happens |
|---|---|
| Before work starts | Design consultation, measure, material selection, estimate, and ordering. Most projects begin within 7–10 business days after ordering. |
| Week 1 | Demolition, then plumbing and electrical rough-in. Where a permit applies, the walls stay open until the rough-in passes inspection. |
| Week 2 | Drywall, then the shower pan and waterproofing, which have to cure before tile. Wall and floor tile, then grout once the setting material has dried. |
| Week 3 | Paint. Vanity cabinets set. The stone vanity top is templated from the installed cabinet, then fabricated. Shower glass measured, if included. |
| Week 4 | Countertop, sink, faucet, fixtures, lighting, and mirrors installed. Custom shower glass, if included, goes in last. Final walk-through. |
Some days on a remodel have no one working in the bathroom: waterproofing curing, an inspection waiting to be scheduled, or a stone top being fabricated. Those days are part of the schedule, not a delay.
Why cabinet lead time matters
The vanity has to be installed before the stone top can be templated, and the top has to be in before the sink and faucet go on. A slow cabinet order holds up everything after it.
Our cabinets have an average lead time of 3–7 business days, so the vanity is ready when the schedule calls for it and the stone top is not left waiting on the cabinet. Browse styles on our bathroom vanities page.
What makes a remodel take longer
Moving plumbing. On a concrete slab, a moved drain means cutting and patching the slab, and it needs a permit.
Permit approval. Plumbing, electrical, and structural changes need a permit. We pull the permits for you.
Changes after work starts. Changes are no problem. Each one is confirmed with you as a change order before we proceed, and some add time.
Custom shower glass. If you add a custom glass door, it is cut to fit after tiling, so the shower finishes last.
What makes it faster
Keep the layout. Leaving the toilet, shower drain, and sink where they are saves time.
Choose everything before demolition. Deciding the tile, fixtures, vanity, and top up front means no waiting mid-project.
One team for everything. When cabinets, countertops, tile, plumbing, and electrical come from one team, fewer details wait on another contractor.
Can you live at home during a bathroom remodel?
In most cases, yes, especially if you have more than one bathroom. You do not need to be home the whole time. We ask that you be there on the first day of installation to review the project details, and again for the final walk-through.
Frequently asked questions
What can delay a bathroom remodel?
The usual causes are inspection scheduling, special-order materials, moving plumbing, and changes after work starts. Choosing every material before demolition avoids most material delays.
Can you remodel a bathroom in 2 weeks?
Yes, a smaller remodel with no layout or plumbing changes can finish at the short end of the usual 2–4 weeks, especially when every material is chosen before demolition. For shower-only projects, see our walk-in shower cost guide and tub-to-shower conversion guide
What happens next
- Book a free design consultation, or schedule an in-home measurement.
- We measure and talk through how you use the room.
- You choose materials with a designer before demolition.
- We build it, finished with a final walk-through and backed by a one-year labor warranty.
See our bathroom design guide, our bathroom remodeling service, or contact us. We serve San Antonio, including Stone Oak and Encino Ranch, and the surrounding areas, such as Alamo Heights, Helotes, and Shavano Park.
New Generation Kitchen & Bath
Trusted Kitchen & Bath Remodeling in San Antonio
New Generation Kitchen & Bath is a full-service remodeling company with over 10 years of experience serving the greater San Antonio area. From complete kitchen remodels and custom cabinetry to bathroom renovations, we deliver quality craftsmanship, premium materials, and dependable service designed to bring your vision to life.